Railway Rake Handling & Loading at Kandla Port

Rake placement, loading, unloading and dispatch coordinated directly with railway authorities and freight teams.

How we work it

Rake work is a clock problem. From placement to release you have a fixed free time, and demurrage starts the moment you slip. We keep loaders, dumpers and a labour gang standing by so loading starts within minutes of placement, day or night.

150+
Rakes handled / year
Zero-wait
Placement-to-start
Multi-rake
Parallel working

What the scope covers.

Rake loading

BOXN, BCN and open wagon loading of salt, clinker, minerals and bagged cargo within free time.

Rake unloading

Fast unloading, wagon cleaning and yard stacking with owned excavators and payloaders.

Railway coordination

Indent follow-up, placement liaison and RR documentation with railway and port authorities.

Parallel operations

Multiple rakes worked simultaneously alongside vessel operations without dividing supervision.

Execution sequence

From nomination to final statement.

  1. 01Indent placement and siding allotment follow-up
  2. 02Cargo staged at siding before rake arrival
  3. 03Gangs and machinery deployed on placement
  4. 04Loading / unloading completed within free time
  5. 05Weighment, RR documentation and release

Questions we get asked.

Can you work rakes and a vessel at the same time?

Yes. Our fleet size and gang strength are sized for simultaneous vessel and multi-rake operations — this is routine work for us at Kandla.

Do you handle demurrage-sensitive free-time loading?

That is the core of the service. Equipment and labour are positioned before placement so loading begins immediately.

Need railway rake handling at Kandla?

Send the cargo details and we will revert with a working plan and rate.